Laserfiche WebLink
ARCO 1 BP WELL MONITORING DATA SHEET <br /> {TS #: 0509 t.1-BC 1 Station # 2130 <br /> Sampler: aar B Summersett Date: a i <br /> Well .D.: <br /> VW Well Diameter: 2 3 6 8 <br /> Total Well Depth: 51 . Depth to Water: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: Grade D.O. Meter (if req'd): HACH <br /> M�etl Diameter Multiplier Well Diameter Multiplier / ,�� <br /> 1" 0.04 4" 0.65 G <br /> 2" 0.16 6' 1.47 80Y. <br /> 3' 0.37 Other radius"'0.163 <br /> 1'(7.061 <br /> Purge Method: Bailer Sampling Method: Bailer <br /> Disposable Bailer Disposable Bailer <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible'' Other: <br /> Extraction Pump <br /> Other: <br /> Top of Screen: if well is listed as a no-purge,confirm that water level is below the top <br /> of screen. Otherwise,the well must be purged. <br /> X Gals, <br /> 1 Case Volume(Gals.) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp(F) pH (MS ar Gals. Removed Observations <br /> 1334 a,� `�.3 �a t <br /> )131( —71 -3 - .Z 7 eb7,,j <br /> 1332 �1 l• D' ,b ,� eAa <br /> Li <br /> r r `l. w t. A t <br /> Did well dewater? Yes Gallons actually evacuated: r3,6 <br /> Sampling Time: Sampling Date: A t b t k <br /> Sample 1.D.: ULd _ -3 Laboratory: Sequoia <br /> Analyzed for: GRO BTEX Ethanol Oxygenates(5) 1,2-DCA <br /> .O. (if req'd): Pre-purge: mg/L — ,y Post-purge: 0y <br /> O.R.P. (if req'd): Pre-purge: mVPost-pL. mgt <br /> mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95772 (408) 573-0555 <br /> i <br />