My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0010021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 1:24:30 PM
Creation date
8/1/2019 11:26:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010021
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> IL BP GEM OIL COMPANY TYPE A BILL OF LADING <br /> SOURCE RECORD BILL OF LADING FOR NON- <br /> HAZARDOUS PURGEWATER RECOVERED FROM <br /> GROUNDWATER WELLS AT BP GEM OIL COMPANY Zt3 <br /> FACILITIES IN THE STATE OF CALIFORNLA;. -THE NON- Station# <br /> HAZARDOUS PURGE- WATER WHICH ` HAS BEEN <br /> RECOVERED FROM GROUND- WATER WELLS IS MgU A) El sf S� lc.Fes• <br /> COLLECTED BY THE CONTRACTOR, MADE UP INTO Station Address <br /> LOADS OF APPROPRIATE SIZE AND HAULED BY <br /> DILLARD ENVIRONMENTAL TO THE ALTAMONT <br /> LANDFILL AND RESOURCE RECOVERY FACILITY IN Total Gallons Collected From Groundwater Monitoring Wells <br /> LIVERMORE, CALIFORNIA <br /> The contractor performing this work is BLAINE TECH 2 ?5 <br /> SERVICES, INC (BTS), 1580 Rogers Avenue, San Jose, CA <br /> 95112 (phone [408] 573-0555) Blame Tech Services, Inc is added equip an other <br /> authorized by BP GEM OIL COMPANY to recover, collect, �' <br /> rinse water <br /> apportion into loads the Non-Hazardous Well Purgewater that is -I Z� adjustments �—' <br /> drawn from wells at the BP GEM Oil Company facility indicated TOTAL GALS. loaded onto <br /> below and deliver that purgewater to BTS Transport routing of RECOVERED 00 �b BTS vehicle# sl <br /> the Non-Hazardous Well Purgewater may be direct from one BP <br /> GEM facility to the designated destination point, from one BP BTS event# time date <br /> GEM facility to the designated destination point via another BP <br /> GEM facility, from a BP GEM facility to the designated <br /> destination point via the contractor's facility, or any combination <br /> thereof The Nora-Hazardous Well Purgewater is and remains the signature f <br /> property of BP GEM Oil Company <br /> tThis Source Record BILL OF LADING was initiated to <br /> cover the recovery of Non-Hazardous Well Purgewater from wells <br /> at the BP GEM Oil Company facility described below REC'D AT time date <br /> L'S sple- 1§71-,5" SLI Zv /af- <br /> unloaded by <br /> signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.