Laserfiche WebLink
3 ARCO / BP WELL MONITORING DATA SHEET <br /> s #: 050619-BCI Station # 2130 <br /> Sampler. P Clark B tk e tt Date: _ �j s` <br /> Well Y.D.: yhw_2 Well Diameter: 2 3 8) 6 8 <br /> Total Well Depth: •12 U0 Depth to Water: LA-&,5-1 <br /> Depth to Free Product. Thicl mess of Free Product (feet). <br /> Referenced to: 9P Grade ID.O. Meter (1f req'd): sl HACH <br /> Well Diameter multlylle well Ibaum Multiplier <br /> go,L3 1" 004 4" 065 <br /> 2" 016 6" 147 <br /> V 037 Other radius=•0163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Bailer V-16isposable Bailer <br /> P sitive Air Displacement Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise,the well must be purged <br /> I X 3 = 511 a Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> i <br /> Time Temp("F) pH (mS or 1 Gals Removed Observations <br /> y23 -iIX ?,D <br /> A in,C) <br /> �y3E -22 10 <br /> 5ol, � w^ yu,yg <br /> Did well dewater? Yes ® Gallons actually evacuated: 'qcj ,c <br /> N35 Sampling Time: � � 3 ,) Sampling Date: r- (°j-C) <br /> Sample I.D.• rnuj Z Laboratory. Sequoia <br /> Analyzed for: ORO BTBx Ethanol Oxygenatcs(5) 1.2-DCA Other- <br /> O. .' '"s <br /> if req'd): Pre-purge a � <br /> { q )• P g Post-purge- � , ( `"g/ <br /> O.R.P. (if req'd): Pre-purge mV Post-purge, m`T <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />