Laserfiche WebLink
ARCO/ BP WELL MONITORING DATA SHEET <br /> Ts #. 050619-BCI Station # 2130 <br /> Sampler P Clark B Summeresett Date• (�((, <br /> Well I.D.: -MO -La Well Diameter: 2 3 4 6 8 <br /> Total Well Depth: Depth to Water: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: PVC Grade D.Q. Meter(if req'd): YSI HACH <br /> Well Diameter MultivlWeil DIRMIC Muldnher <br /> 1" 004 4" 065 <br /> 2" 016 6" 147 <br /> 3" 037 Other radius'•0163 <br /> Purge Method Baiter Sampling Method Bauer <br /> Disposable Batter Disposable Bailer <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> of screen Otherwise,the well must be purged <br /> X Gals <br /> 1 Case Volume(Gals} Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp("F) pH (mS orµS) Gals Removed Observations <br /> Did well dewater? Yes No Gallons actually evacuated: <br /> Sampling Time. Sampling Date: <br /> Sample I.D.: Laboratory: Sequoia <br /> Analyzed for: GRo BTEx Ethanal Oxygenates(5) 1,2-DCA Other <br /> O. (if req'd). Pre-purge mgt Post-purge. m$/L <br /> .R.P. (if req'd): Pre-purge mV Post-purge- <br /> to mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />