Laserfiche WebLink
ARCO I BP WELL MONITORING DATA SHEET <br /> TS #: 050619--BCI Station# 2130 <br /> Sampler: B Summeresett Date: (��l4 64- <br /> Well l.D.. � Well Diameter: 2 3 15 6 8 <br /> Uw-� � <br /> Total Well Depth: 50,-7 a Depth to Water: qZ,34 <br /> Depth to Free Product: Thickness of Free Product (feet)• <br /> Referenced to: Grade D.O. Meter (if req'd). 1 HACH <br /> �� V17eli D,amotor multighe MMyltmlter h u <br /> (�►T <br /> 1. 004 4" 065 861 <br /> 2" 016 6" 147 <br /> 3" 037 other radwe*0163 <br /> Purge Method Bailer Sampling Method Batter <br /> Disposable Bailer Disposable Bailer <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen if well is listed as a no-purge,confirm that water level is below the top <br /> of screen Otherwise,the well must be purged. <br /> • 565 X 3 _ 1 l0�5 Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp CF) pH (mS or ) Gals. Removed Observations <br /> c. n rw <br /> — H4 ,3 <br /> 5 �a 110% <br /> Did well dewater? a No Gallons actually evacuated: q <br /> Sampling Time- ael-5-S Sampling Date: <br /> Sample I.D.: � ,_.5 Laboratory: Sequoia <br /> Analyzed for: GRo BTEx Ethanol Oxygenstes(5) 1,2-DCA Other <br /> .O. (1f req'd)- Pre purged Post-purge. �,'� M9 <br /> O.R.P. (if req'd): Pre-purge- mV Post-purge mV <br /> Blaine Tech Services, lnc. 1880 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />