Laserfiche WebLink
ARCO 1 BP WELL MONITORING DATA SHEET <br /> Ts #: 050619-BC 1 Station# 2130 <br /> Sampler: P Clark B Summeresett Date: <br /> Well I.D.. _ Well Diameter: 2 3 6 8 <br /> Total Well Depth: Depth to Water <br /> Depth to Free Product. Thickness of Free Product(feet): <br /> Referenced to: PVC Grade D.O. Meter(if req'd): YSl HACH <br /> Well Diameter MU14211 Well Dtatnetcr h4ult!nlrer <br /> l" 004 4' 065 <br /> r 016 6" 147 <br /> 3" OX Other radius='0163 <br /> Purge Method- Bailer Sampling Method Bailer j <br /> Disposable Bailer Disposable Bailer <br /> i <br /> Positive Air Displacement Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> of screen Otherwise,the well must be purged <br /> • X = Gals <br /> I Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (F) pH (mS orµS) Gals Removed Observations <br /> Dad well dewater7 Yes No Gallons actually evacuated: <br /> Sampling Time: Sampling Date: <br /> Sample T.D.: Laboratory. Sequoia <br /> Analyzed for. ORO BTRX Ethanol oxygenates(s) 1,2-DCA Other <br /> EP (t <br /> eq'd): Pre-purge- mgt Post-purge mg/ <br /> tO.ER. f req'd): Pre-purge- mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 {408} 5T3-0555 <br /> i <br />