Laserfiche WebLink
s <br /> 1E <br /> I <br /> ATC SITE SAFETY PLAN <br /> i <br /> Physical Hazards <br /> II I <br /> Tasks HazardMitigation Measure <br /> t Heavy Equipment(Noise&Physical All heavy equipment used on this project will <br /> contact) be in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Title 8,Subchapter 4, <br /> Construction Safety Orders. In addition, an <br /> exclusion zone applies to all personnel. The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> anytime. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> I <br /> t <br /> iI <br /> li <br /> i <br /> PAGE 6 <br />