Laserfiche WebLink
C- VATC <br /> ASSOCIATES I NC . <br /> Gasoline Tanks <br /> In January 1997, two gasoline USTs were removed from the northwest portion of the property <br /> and soil samples were subsequently collected from the open excavation (see Figure 2). Only one <br /> sample was reported to have contained TPH as gasoline (TPHg) above laboratory detection <br /> limits. Composite samples of the stockpiled excavated soil were collected and analyzed for <br /> TPHg, benzene, toluene, ethylbenzene, xylenes (BTEX), and methyl tert-butyl ether (MTBE). <br /> Because laboratory results did not detect any of the analytes above the laboratory detection limit, <br /> the stockpiled soil along with clean pea gravel and Class A/B subbase was used to backfill the <br /> excavation. <br /> On February 23 and 24, 1999, ATC supervised the advancement of four soil borings (SB6, S137, <br /> S138, and S139) in the vicinity former gasoline USTs (Figure 4). Drilling was conducted utilizing <br /> a hollow stem auger drill rig. Soil borings S136 through SB8 were advanced and sampled to 36.5 <br /> feet bgs. Soil boring S139 was advanced and sampled to 41.5 feet bgs. <br /> Of the fourteen soil samples collected from soil borings S136, S137, S138, and S139, none were <br /> reported by the laboratory to contain TPHg, BTEX, or fuel oxygenates above laboratory <br /> detection limits. Analytical results of soil samples are summarized in Table 1. <br /> In correspondence dated June 25, 1999, PHS/EHD requested additional work at the site to further <br /> define the lateral extent of diesel contamination in the vicinity the former diesel USTs. <br /> METHODS AND PROCEDURES <br /> To further define the lateral extent of diesel petroleum hydrocarbons in the vicinity of the former <br /> diesel USTs, a total of two (2) angled soil borings are proposed at the site. These soil borings <br /> will be placed east of the former diesel USTs in the vicinity of SB-3. All field activities will be <br /> performed in accordance ATC's Site Safety Plan and Quality Assurance/Quality Control Plan <br /> (QA/QC Plan) submitted to PHS/EHD on February 1, 1999. <br /> Soil Boring Advancement and Sampling <br /> Drilling activities at the site will be performed by V & W Drilling (State C57 license no. 720904) <br /> utilizing a truck mounted Geoprobe® rig employing DPT. <br /> The two proposed soil borings will be completed at depths of 25 feet bgs and advanced at an <br /> approximate angle of 30 degrees from vertical. Soil samples will be collected from the two <br /> borings at four-foot intervals in acetate sampling tubes and described according to the Unified <br /> Soil Classification System. The soil samples and any drill cuttings will be characterized for soil <br /> w:\17292\reports\workp1=.doc 3 <br />