My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2900 - Site Mitigation Program
>
PR0507209
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 2:56:53 PM
Creation date
8/1/2019 1:22:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507209
PE
2950
FACILITY_ID
FA0007737
FACILITY_NAME
STOCKTON UNIFIED SCHOOL DISTRICT
STREET_NUMBER
1932
Direction
N
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 N EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br /> ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 tt <br /> I <br /> t <br /> This sample will be immediately placed into a cooler containing dry ice or frozen chemical ice. <br /> A "high-low" temperature recording thermometer will accompany sample shipments to ensure <br /> proper temperature maintenance. The samples will be delivered to a state certified laboratory <br /> following under chain-of-custody protocol within 48 hours of sampling, whenever possible. <br /> Soil in the uppermost brass tube will be described according to ASTM standard practice for <br /> description and identification of soils (ASTM D-2488-84). Stratigraphic, genetic and other <br /> t <br /> data/interpretations will also be recorded. Soil properties may also be detemtined from the <br /> t <br /> middle brass tube and from the sampler shoe. Altematively the second sample tube may be <br /> used with the uppermost tube for preparation of duplicates. These field observations will be <br /> noted on a log prepared for each boring/well. <br /> During sampling, latex gloves will be worn to prevent cross-contamination with other samples. <br /> The disposable gloves will be discarded after collecting samples from each 18-inch sample <br /> drive. <br /> Soil samples will be collected at 5-foot intervals, at significant changes in Ethology and intervals <br /> of obvious contamination in order to develop a complete profile of soil contamination. <br /> 11.2 Sample Collection During Tank Removal y <br /> Soil samples will be collected as soon as possible after removal of the tank. Where feasible, all ' <br /> preparations for soil sampling will be made prior to tank removal. Soil samples collected from <br /> a backhoe bucket or directly from the excavation floor will be collected in a thin-walled l <br /> stainless steel or brass cylinder at least 3-inches long by 1-inch in diameter. From 3 to 24- <br /> W:\Admin\Shells\QAQC-98.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.