My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2900 - Site Mitigation Program
>
PR0507209
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 2:56:53 PM
Creation date
8/1/2019 1:22:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507209
PE
2950
FACILITY_ID
FA0007737
FACILITY_NAME
STOCKTON UNIFIED SCHOOL DISTRICT
STREET_NUMBER
1932
Direction
N
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 N EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U U <br /> ATC Associates Inc. - <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 r <br /> { <br /> deionized water. this procedure will be carred out on-site before sampling of other monitoring wells, if <br /> more than one well is to be sampled with the sample sampling device. <br /> Immediately prior to sampling, the depth to water (DTW) in the well will be recorded. The thickness <br /> of product on top of the groundwater, if present, will be measured using an interface probe. The <br /> procedure for monitoring is presented in Section 9.0 (Groundwater Monitoring Protocol). <br /> If free product is detected, analysis of groundwater at the interface for dissolved product will not be <br /> conducted. A product sample will be collected for source identification. If all free product cannot be <br /> removed, an interval specific sampling device may be utilized to collect a sample from below the zone <br /> of free product. Before collecting groundwater samples from each well, the well will be purged until <br /> indicator parameters (temperature, conductivity, and pl-I) stabilize. This will entail the removal of at <br /> least four well casing volumes by bailing or pumping. The criteria for determining well casing volumes <br /> and temporary storage of purged water is outlined in Section 10.0 (Well Development Protocol). The <br /> indicator parameter measurements will be taken both before and after purging of each well casing <br /> volumes. Once the well is purged and indicator parameters have stabilized, a sample will be collected <br /> after the water level approaches 80 percent of its initial elevation. Where water level recovery is slow, <br /> the sample will be collected after stabilization is achieved and enough;.water is present to fill sample <br /> containers. <br /> Cross contamination from transferring pumps (or bailers) from well to well will be avoided by utilizing <br /> dedicated equipment. Where this is not feasible, thorough cleaning of equipment will be performed ` <br /> between sampling rounds. Sampling will proceed from the least contaminated to the most <br /> contaminated well, if information is available before sample collection, or if it is indicated by field <br /> W:Wdmin\Shells\ AQC-98.DOC ' <br /> Q <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.