My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2900 - Site Mitigation Program
>
PR0507209
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 2:56:53 PM
Creation date
8/1/2019 1:22:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507209
PE
2950
FACILITY_ID
FA0007737
FACILITY_NAME
STOCKTON UNIFIED SCHOOL DISTRICT
STREET_NUMBER
1932
Direction
N
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 N EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f l IL t f I � .CA <br /> 90p��e� <br /> W4 <br /> ENGINEERING AND ENVIRONMENTAL SERVICES Ttph : (gtb)485-7222 <br /> FAX: (9t6)4$540 <br /> Ms.Margaret rio' 29 October 1997 <br /> San Joaquin County Public Health Services <br /> Environmental Heahh Division <br /> 304 East Weber Street <br /> %witon,California 95202 <br /> Subject: Addendnm to Wort Plan for hwesll k"tion of Storm Drain Inieft <br /> Sttaektas Unified SebaW District <br /> Maintenance and Transportation Center <br /> HLI 00816 <br /> Dear Ms.Lagorio: <br /> We previously submitted an application for a permit to drill soil borings at the Stockton Unified <br /> School District's Maintc-naacc and Transportation Center. A work plan for the proposed <br /> investigation accompanied out 24 October 1997 application submittal. We are :unending the; <br /> number of samples indicated in the work plan that will be analyzed from each boring. (liven the <br /> shallow depths of the soil borings(S to 10 feet),we are pnVosing to analyze only one sarm*from <br /> each soil boring, unless field screening indicates that deeper borings are warranted and additional <br /> samples are appropriate. <br /> We have arranged for the drilling to occur on November a and 5*, assuming that the County can <br /> issue permits by that date. Please let us know as soon as possible if this schedule is not fewible. <br /> Sincerely yours, <br /> IIELMICK&LERNER INC. <br /> ��/ tff. la'4�' <br /> Neel M. Lerner <br /> Project Manager <br /> cc: Roy Knight—Stockton Unified School District <br /> Z_1P10t AMWP Adendum.doc <br /> Z0,d 8608 98b 916 'aui -aau.aal V Mal-WLOH lf81 =6o L6-5Z-'V'Z:10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.