My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010808
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2900 - Site Mitigation Program
>
PR0507209
>
ARCHIVED REPORTS XR0010808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 2:06:31 PM
Creation date
8/1/2019 1:28:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010808
RECORD_ID
PR0507209
PE
2950
FACILITY_ID
FA0007737
FACILITY_NAME
STOCKTON UNIFIED SCHOOL DISTRICT
STREET_NUMBER
1932
Direction
N
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 N EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
View images
View plain text
RfIlR1CX�-1fRNfR <br /> {s- Mr. Charles Leubner <br /> � } 20 January 1997 <br /> Page 7 <br /> Hence the gasoline tank excavation stockpile was deemed acceptable for use as backfill material. <br /> Clean pea gravel and Class AIB subbase was imported for this excavation to complete backfilling. <br /> CONCLUSIONS <br /> Due to the presence of petroleum hydrocarbons remaining in soil beneath Tank T7 (6,150 mg/Kg of <br /> TPH-D) and TI (691 mg/Kg of TPH-G), further investigations are required before these sites can <br /> be closed. A soil investigation of these areas should be conducted to evaluate the vertical extent of <br /> the hydrocarbons that remain in the soil. After the vertical extent of the contamination is <br /> determined, a risk based exposure assessment can be conducted to determine if further remediation <br /> of the tank sites are warranted. <br /> In 1990, four remote fill lines were removed near Tank T7. These lines were located near the <br /> trench excavated for removing the piping for the current project. Figure 4 from Stockton Unified <br /> School District Oil & Fuel Tank Project conducted in 1990 shows the locations of soil samples <br /> collected during the removal of those fill lines. A copy of this Figure is included within this report.. <br /> Petroleum hydrocarbons were detected at depths of 4 to 5 feet below the ground surface in the <br /> trench samples ranging 17 to 5,200 mg/Kg as Total Extractable Hydrocarbons (see attached Table 1 <br /> copied from that project's report). It is recommended that any investigation of Tank T7 also include <br /> sampling of the areas where hydrocarbons remain beneath the remote fill lines removed in 1990. <br /> We recommend that this report be submitted to the County for their concurrence with our findings. <br /> If you have any questions,please call. <br /> Sincerely yours, <br /> EOL <br /> HEL C &LERNER INC. L�� 1 f <br /> # 397)8 <br /> ; <br /> _ Noel M.Lerner IPA <br /> CPA � <br /> Project Manager '�lFQF O <br /> d` <br /> ,ALv <br /> enclosures: Figure 1,2, 3, and 4 (current report) <br /> Figure 4 from Oil&Fuel Storage Tank Project(1991 Report) <br /> Tables 1 and 2 (current report) <br /> Table 1 from Oil&Fuel Storage Tank Project(1991 Report) <br /> - Attachment A-Disposal Manifests <br /> - Attachment B -Laboratory Analysis Reports <br /> J <br /> cc: Ms. Letitcia Briggs- San Joaquin County Environmental Health Division <br /> 'I Z:1P1008IM1 BMOVAL.DOC <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).