Laserfiche WebLink
rM' <br /> CGI/EPA 97 {f P � � � Pete Wilson <br /> AUGl L� tj Governor <br /> State Water <br /> Resources - <br /> Control Board <br /> ill iL1 � ! <br /> �ui <br /> Division of <br /> Clean Water Bob Young <br /> Programs Elkhorn Country Club <br /> 1050 Elkhorn Dr <br /> Mailing Address: <br /> P.Q.Box 944212 Stockton, CA 95209 <br /> _ <br /> Sacramento,CA <br /> 94244-2120_ m UNDERGROUND STORAGE TANK CLEANLIRFLIND, CLAIMNO.9676, FOR'SITE. <br /> 2014 T Street, ADDRESS: 1050 ELKHORN DR, STOCKTON <br /> Suite 130 <br /> Sacramento,CA The State Water Resources Control Board (State Board) is able to issue, pursuant to applicable <br /> 95814 <br /> (916)227-4307 regulations,the enclosed Letter of Commitment(LOC) in an amount not to exceed $40,000. <br /> FAX(916)2274530 This LOC is based upon our review of the corrective action costs you reported to have incurred <br /> World Wide Web to date. The LOC may be modified by the State Board. <br /> http://www.swrcb.ca. <br /> gov/—cwphomel It is very important that you read the terms and conditions listed-in the enclosed LOC. Claims <br /> fundhorne.htm <br /> filed with the Underground Storage Tank Cleanup Fund far exceed the funding available and it is j <br /> very important that you make use of the funding that has been committed to your cleanup in a <br /> timely manner. <br /> Consequently, if you do not submit your first reimbursement request for corrective action <br /> costs which you have incurred within ninety(90) calendar days from the date of this letter. + <br /> your funds will automatically be deQbligated. Once deobligated, any future funds for this <br /> site will be obligated subject to availability of funds at such time when we receive your <br /> reimbursement request. <br /> You are reminded that you must comply with all regulatory agency time schedules and <br /> requirements and you must obtain three bids for any required corrective action. Only corrective <br /> ".action costs required.by-the regulatoryagency to,-protect human haalth,_safety and the 4 <br /> environment can be claimed for reimbursement. Unless waived in writing,you are required to <br /> obtain preapproval of costs for all future corrective action work(form enclosed). If you <br /> have any questions on obtaining preapproval of your costs or the three bid requirement, please <br /> call Martin Clark, our engineer assigned to claims in your Region, at(916) 227-4374. Failure to <br /> obtain preapproval of your future costs may result in the costs not being reimbursed. <br /> The following documents needed to submit your reimbursement request are enclosed: <br /> • "Reimbursement Request Instructions" package. Retain this package for future <br /> 3• , reimbursement requests. These instructions must be followed when seeking <br /> reimbursement for corrective action costs.ineurred after January 1, 1988. Included in the <br /> instruction package are samples of completed reimbursement request forms and <br /> spreadsheets. <br /> Our mission is to preserve and enhance the quality of California's water resources,and <br /> �� Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br />