My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELKHORN
>
1050
>
2900 - Site Mitigation Program
>
PR0505234
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 3:05:12 PM
Creation date
8/1/2019 2:13:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505234
PE
2951
FACILITY_ID
FA0001103
FACILITY_NAME
Elkhorn Golf Club
STREET_NUMBER
1050
STREET_NAME
ELKHORN
STREET_TYPE
DR
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
1050 ELKHORN DR
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced GeoEnvironrnental, Inc. v�- <br /> of Northern Calif n-nia <br /> 14 October 1997 <br /> AGE-NNC Project No..95-0118: <br /> Mr. Steve Sasson <br /> San Joaquin County Public Health - Environmental Health Division <br /> 304 East Weber Avenue RFroFIVED <br /> Stockton, California 95202 OCT 14 1997 <br /> Subject: Remedial Action Nark Plan AddendumENVIRONMENTAL HEALTH <br /> PERMIT/ SERVICES <br /> ELKHOi,�1 COUNTRY CLUB <br /> 1.050 Elkhorn Drive, Stockton, California <br /> Dear Mr. Sasson: <br /> In accordance with your request, Aa%!anced GeoEnvironmental, Inc. (AGE) has prepared the <br /> enclosed Remedial action NN°ork Plan Addendum detailing the design of a remediation system <br /> network and well construction logs at 1050 Elkhorn Drive, Stockton, California. <br /> k. Soil Vapor Extraction(SVE) location and Network <br /> The location of rhe VES unit is proposed at the ti estern edge of the maintenance building at the site, <br /> under the mi nin�g. This location ,trill place the unit near the electrical outlets and close to the SVE <br /> Fr nctt -ork. The awning it-ill also protect the extraction unit from Breather. A gated enclosure will <br /> secure the I ES zrnit. Approximate system location and network is depicted in Figure 2. <br /> Two-inch clictzareter PGC piping will be installed under round from the proposed SPE well head <br /> locations to a i•upor cb opout drum. The PVC piping will carry hydrocarbon vapor from the SVE well <br /> heads to the 1,ES writ. A PVCflosv control k-al a will be installed it:each line so that rapors can be <br /> clra�rnz from each ,rc:ll independently. <br /> • In-situ Air-Sparging JAS) location and stet«=ork <br /> - IAS is proposed in conjunction with SVE concw-rently at the site. The proposed JAS systenz tit.ould <br /> also be located at the western edge of the maintenance building at the site, under the awning. The <br /> *-srem would consist of a compressar to inject air beneath the hater table using air sparging wells. <br /> .d one-inch diameter PVC piping netyrork ivill carry air fi-om the compressor to the sparging wells. <br /> The PITC piping is4ll be installed beneath the ground surface. A PVCflozv control valve will be <br /> installed at each sparging well to direct airflow. <br /> 1803 West March Lane,Suite A.Stockton.California 95207 <br /> Telephone(209)956-0264 FAX(209)955-0700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.