Laserfiche WebLink
s <br /> 14 October 1997 <br /> AGE-]STC Project No. 95-0118 <br /> Page 2 of 2 <br /> The compressor will provide from one to four cubic feet per minute (cfm) of air, at a pressure of <br /> approximately 15 to 20 pounds per square inch (psi) to each sparge ivell. The injected air will <br /> Volatilize dissolved h))drocarbons in ground ivatel„ and force hydrocarbon vapor hito the vadose <br /> ,one, where it can be withdrawn by the STYE system. Approximate air sparging well construction is <br /> depictecl in Figure 3. <br /> If you have any questions or comments, please contact our office at (209) 467-1006 <br /> Sincerely, <br /> Adwinced GeoLnvirom-riental, Ine. <br /> OAA;,�A&— <br /> William Little <br /> Staff Geologist <br /> Enclosures <br /> cc: (3) addressee <br /> .-fdrurrccd CcnEmiran mcnlal,Inv. <br />