Laserfiche WebLink
HEALTH <br /> 11-29-95 <br /> NO 33 PM is 41 <br /> Steve, <br /> Mr . Davis has signed a contract to continue with <br /> the preparation of the feasibility study/remedial action <br /> plan. I have forwarded the Problem Assessment Report <br /> and this Project Status Report to our engineering staff <br /> for assistance . I also enclosed a copy of your letter <br /> dated 11-9-95 to ensure that all issues would be addressed . <br /> Dayne A <br /> rary <br /> I <br /> i <br /> j <br />�I <br /> I <br />