Laserfiche WebLink
f <br /> DATE NAME ACCT CODE HOURS COMMENTS Page 2 <br /> i <br /> 04/15/94 M. Collins 212 .8 Spoke with Dayne Frary of W.W. Irwin <br /> on exact time of stock pile soil <br /> sampling that day since there had <br /> been a mix-up. <br /> 04/15/94 M. Collins 210 1.8 On site to witness sampling of stock <br /> piled soil. <br /> 04/21/94 M. Collins 212 .8 Spoke with Dwight Davis, the <br /> responsible party, regarding the <br /> minimum number of monitoring wells <br /> that would be required. <br /> 04/22/94 M. Collins 215 1.4 Discussed the site with Supervisor <br /> Diane Hinson at the request of <br /> Dwight Davis the responsible party. <br /> Mr. Davis was unwilling to install <br /> the minimum # of monitoring wells <br /> (3) y Mr. Davis wanted only to <br /> install one well. <br /> i <br /> 04/22/94 M. Collins 215 .8 Spoke with Dwight Davis the <br /> responsible party regarding <br /> discussion with Supervisor Diane <br /> Hinson and mailed him a copy of Tri- <br /> Regional Recommendations. <br /> 04/27/94 M. Collins 212 .8 Spoke with Dayne Frary of W.W. Irwin <br /> after reviewing faxed soil sample <br /> results where the wrong method of <br /> analysis was used. <br /> 04/27/94 M. Collins 212 1.6 Soil samples were reanalyzed using <br /> correct method of analysis and the <br /> results were faxed. Spoke to Dayne <br /> Frary of W.W. Irwin who requested <br /> approval in writing to fill the <br /> excavation with the stockpiled soil <br /> based on the faxed sample results. <br /> Drafted requested approval "letter. <br /> 04/28/94 M. Collins 212 .8 Spoke with Dayne Frary of W.W. Irwin <br /> and requested hard copy of <br /> stockpiled soil samples prior to <br /> mailing letter approving this soil <br /> for filling the excavation. <br /> i <br /> 05/15/94 M. Collins 212 .8 Spoke with Village West personnel <br /> and was informed the excavation had <br /> been filled. <br /> 05/15/94 M. Collins 210 1.8 On site to verify filled excavation. l <br /> 05/15/94 M. Collins 215 1.0 Reviewed file to determine best <br /> location for the monitoring wells <br /> and updated site chronology. <br /> I <br /> 05/20/94 M.;, Collins 212 .8 Spoke with Dayne Frary of W.W. Irwin <br /> about the need to move forward with <br /> the installation of monitoring <br /> wells. <br /> i <br />