Laserfiche WebLink
I <br /> rr <br /> { , Completion of Initial Monitoring Wells <br /> �r <br /> On June 6, 1994, soil borings 4, 5, and 6 were drilled and completed as ground-water <br /> monitoring wells MW-4, MW-5, and MW-6. This sequence of well numbers was selected by <br /> the field geologist in order to avoid confusion regarding the previous Hydropunch'''numbers HP- <br /> 1, HP-2, and HP-3. All monitoring wells were drilled, sampled, and completed in order to <br /> determine the horizontal and vertical extent of soil and ground-water contamination and to allow <br /> for calculation of the ground-water flow direction and gradient. The monitoring well locations <br /> are depicted on the Site Sketch, Figure 2. W.W. Irvin, Inc. of Merced served as the <br /> environmental consultant while Woodward Drilling Company of Rio Vista drilled and completed <br /> the wells to a total depths of 30 feet. <br /> Collected soil samples were placed in an ice chest chilled to 4°C and dispatched to Sherwood <br /> Labs, Inc. of Hilmar using appropriate chain-of-custody procedures. Each sample collected to <br /> a depth of 20 feet was analyzed for the presence of Total Petroleum Hydrocarbons as gasoline <br /> (TPH-g) by modified EPA Method 801515030, Total Recoverable Petroleum Hydrocarbons as <br /> diesel (TRPH-d), and the volatile aromatics benzene, toluene, ethylbenzene, and total xylenes <br /> (BTEX) by EPA Method 8020. Detectable, primarily fractional BTEX analytes were detected <br /> only in soil samples collected from MW-6. The highest TPH-g result was 39 mg/Kg, revealed <br /> .:- in the sample collected from MW-6 at 15 feet bsg. TRPH-d results were nondetectable except <br /> for 8 mg/Kg of weathered diesel revealed in the sample collected from MW-5 at 5 feet. <br /> _ Ground-water samples collected from MW-4, MW-5, and MW-6 were received at Sherwood <br /> Labs on June 21, 1994. The analytical results revealed wholly nondetectable concentrations of <br /> TRPH-d analytes and nondetectable results for TPH-g and BTEX analytes in samples collected <br /> from wells MW-4 and MW-5. The results of the analysis of the sample collected from MW-6 <br /> indicated that the ground water underlying that vicinity was significantly impacted with TPH-g <br /> and BTEX analytes well above the Maximum Contamination Levels (MCLs) set by the <br /> California Department of Health Services (CDHS). <br /> Problem Assessment and Completions of MW-7 and MW-8 <br /> On July 3, 1995, W.W. Irwin, Inc. directed the drilling, logging, and sampling of <br /> HydropunchesTm HP-7, HP-8, HP-9, and HP-10. HP-7 and HP-8 were completed as monitoring <br /> wells MW-7 and MW-8 after ground-water samples collected for "rushed" analyses of gasoline <br /> and diesel analytes at Sherwood Labs in Hilmar were found nondetectable. The new monitoring <br /> wells were drilled, sampled, and completed in order to determine the horizontal and vertical <br /> E extent of soil and ground-water contamination. The new monitoring well locations are initially <br /> depicted on the Site Plan, Figure 2. <br /> W.W. Irvin, Inc. <br /> Project No. 33016.07 <br /> December 1995 3 <br />