My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010937
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ENTERPRISE
>
355
>
3500 - Local Oversight Program
>
PR0544728
>
ARCHIVED REPORTS XR0010937
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 5:02:10 PM
Creation date
8/1/2019 4:42:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010937
RECORD_ID
PR0544728
PE
3528
FACILITY_ID
FA0003802
FACILITY_NAME
ACCURATE DELIVERY SYSTEMS
STREET_NUMBER
355
STREET_NAME
ENTERPRISE
STREET_TYPE
PL
City
TRACY
Zip
95304
APN
21221008
CURRENT_STATUS
02
SITE_LOCATION
355 ENTERPRISE PL
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. .. .. .. . ..... .. ... <br /> Quarterly Report - First Quarter 2003 <br /> ENTERPRISE INVESTMENTS (Former J.B. Murphy Trucking) <br /> 355 Enterprise Place, Tracy, California <br /> 1.0. INTRODUCTION <br /> At the request of Mr. Monty Warren of Enterprise Investments,Advanced GeoEnvironrnental,Inc. <br /> (AGE) has prepared this quarterly report for 355 Enterprise Place, Tracy, California. The site and <br /> the surrounding area are illustrated on Figure 1. Structures,boring and well locations are illustrated <br /> =i on Figure 2. Site background information is provided in Appendix A <br /> 2.0. PROCEDURES <br /> Five ground water monitoring wells (MWI through MW5) and one ground water extraction well <br /> (EW1) were monitored and sampled on 21 March 2003. Field work was performed in accordance <br /> with guidelines issued by the Central Valley Regional Water Quality Control Board(CVRWQCB) <br /> for the investigation of underground storage tanks (UST) sites. <br /> 2.1. WELL MONITORING AND PURGING <br /> A Solinst water level meter was used to measure the depth to ground water in the wells relative to <br /> the tops of the well casings. The ground water elevations and gradient were determined from these <br /> data(Table 1). <br /> j After recording water level measurements,disposable plastic bailers were used to purge wells MW 1, <br /> MW3, MW4 and MW5 of standing water and a Watera Hydrolift pump was used to purge wells <br /> MW2 and EW 1 of standing water.Approximately 6 gallons of water(a minimum of 3 casing water- <br /> volumes per well)were removed from MWl,MW3,MW4 and MW5, approximately 13 gallons of <br /> water were removed from MW2 and approximately 60 gallons of water were removed from EW1. <br /> Ground water temperature,pH and conductivity were measured at regular intervals during purging <br /> using an Oakton water analyzer. Purged ground water was containerized in properly labeled <br /> DOT-approved model 17H 55-gallon drums and was stored on-site. Field sheets and data are <br /> included in Appendix B. <br /> it <br /> - 2.2. COLLECTION OF GROUND WATER SAMPLES <br /> Water samples were collected from purged wells MWl, MW3, MW4 and MW5 using new <br /> disposable plastic bailers while samples from wells MW2 and EW 1 were collected with a hose bailer <br /> after allowing all wells to achieve a minimum 80%recovery of the pre-purge water volume. Each <br /> water sample was transferred into three 40-m1 VOA vials containing 0.5 m118%hydrochloric acid <br /> as a sample preservative and into one 1-liter amber bottle without sample preservative. After <br /> I <br /> Advanced CeoE+nvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.