Laserfiche WebLink
Quarterl Report - Second Quarter 2005 <br /> ENTERPRISE INVESTMENTS (Former J.B. Murphy Trucking) <br /> 355 Enterprise Place, Tracy, California I` <br /> E; <br /> i; <br /> 1 1.0. INTRODUCTION <br /> j <br /> _ At the request of Mr. Monty Warren of Enterprise Investments,Advanced GeoEnvironmental,Inc. <br /> (AGE)has prepared this quarterly report for 355 Enterprise Place, Tracy, California(site). The site <br /> and surrounding area are illustrated on Figure 1. Structures,borings,and well locations are illustrated !' <br /> E; <br /> on Figure 2. Site background information is provided in Appendix A. E, <br /> 2.0. PROCEDURES <br /> Five ground water monitoring wells(MW-1 through MW-5)and one groundwater extraction well <br /> (EW-1) were monitored and sampled on 24 June 2005. Field work was performed in accordance <br /> with guidelines issued by the Central Valley Regional Water Quality Control Board(CVRWQCB) <br /> for the investigation of underground storage tanks (UST) sites. <br /> 2.1. WELL MONITORING AND PURGING <br /> =_.j A Solinst water level meter was used to measure the depth to ground water in wells MW-1 through <br /> MW-5 and EW-1 relative to the tops of the well casings.The ground water elevations and gradient <br /> ! ` were determined from this data(Table 1). <br /> After recording water level measurements, disposable plastic bailers .were used to purge wells <br /> MW-1, MW-3, MW-4 and MW-5 of standing water; a Waterra inertial pump was used to purge {' <br /> wells MW-2 and EW-1 of standing water.Approximately six gallons of water(a minimum of three s; <br /> casing water volumes per well) were removed from wells MW-1, MW-3, MW-4, and MW-5, <br /> approximately fifteen gallons of water were removed from well MW-2, and approximately fifty <br /> gallons of water were removed from well EW-1. Ground water temperature,pH, and conductivity <br /> were measured at regular intervals during purging using an Oakton water analyzer. Purged ground <br /> water was containerized in properly labeled, Department of Transportation (DOT)-approved <br /> 55-gallon drums and stored on-site. Field sheets and data are included in Appendix B. <br /> 2.2. COLLECTION OF GROUND WATER SAMPLES <br /> Water samples were collected from purged wells MW-1,MW-3,MW-4 and MW-5 using dedicated ' <br /> disposable plastic bailers, and water samples were collected from wells MW-2 and EW-1 using a <br /> hose bailer, after allowing all wells to achieve a minimum 80% recovery of the pre-purge water <br /> volume. Each water sample was transferred into three 40-milliliter (ml) volatile organic analysis F <br /> (VOA)vials containing 0.5 ml 18%hydrochloric acid solution as a sample preservative,and into one <br /> -- Advanced GeoEnvironmcntal,Inc. E 1 <br /> '.i Pf <br />