Laserfiche WebLink
_ ___ ------ <br /> Quarterly Report - First Quarter 2005 <br /> ENTERPRISE INVESTMENTS (Former J.B. Murphy Trucking) <br /> j 355 Enterprise Place,Tracy, California <br /> i <br /> f ) <br /> 1.0. INTRODUCTION <br /> At the request of Mr. Monty Warren of Enterprise Investments,Advanced GeoEnvironmental, Inc. <br /> (AGE)has prepared this quarterly report for 355 Enterprise Place,Tracy, California(site). The site <br /> and surrounding area are illustrated on Figure 1.Structures,borings,and well locations are illustrated <br /> ='a <br /> on Figure 2. Site background information is provided in Appendix A. <br /> 2.0. PROCEDURES <br /> Five ground water monitoring wells(MW-1 through MW-5) and one ground water extraction well <br /> =, (EW-1)were monitored and sampled on 10 February 2005.Fieldwork was performed in accordance <br /> with guidelines issued by the Central Valley Regional Water Quality Control Board(CVRWQCB) <br /> for the investigation of underground storage tanks (UST) sites. <br /> J <br /> '2.1. WELL MONITORING AND PURGING <br /> ! i ` - A Solinst water level meter was used to measure the depth to ground water in wells MW-1 through <br /> MW-5 and EW-1 relative to the tops of the well casings. The ground water elevations and gradient <br /> were determined from this data(Table 1). <br /> After recording water level measurements,disposable plastic bailers were used to purge wells MW-1 <br /> j through MW-5 of standing water;a Waterra inertial pump was used to purge well EW-1 of standing <br /> water.Approximately 4 to 4.5 gallons of water(a minimum of three casing water volumes per well) <br /> were removed from wells MW-1, MW-3, MW-4, and MW-5, approximately 11 gallons of water <br /> ! were removed from well MW-2, and approximately 40 gallons of water were removed from well <br /> EW-1. Ground water temperature, pH, and conductivity were measured at regular intervals during <br /> purging using an Oakton water analyzer.Purged ground water was containerized in properly labeled, <br /> Department of Transportation(DOT)-approved 55-gallon drums and stored on-site.Field sheets and <br /> data are included in Appendix B. <br /> 2.2. COLLECTION OF GROUND WATER SAMPLES <br /> Water samples were collected from purged wells MW-1 through MW-5 using dedicated disposable <br /> plastic bailers and the sample collected from well EW-I was collected with a hose bailer after <br /> { allowing all wells to achieve a minimum 80%recovery of the pre-purge water volume. Each water <br /> sample was transferred into three 40-milliliter(ml)volatile organic analysis(VOA)vials containing <br /> 0.5 ml 18%hydrochloric acid solution as a sample preservative, and into one 1-liter amber bottle <br /> Advanced GeoEnvironmenfal,Inc. <br /> i. <br /> Ki <br />