My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2016 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
INSTALL 2016 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2019 3:32:32 PM
Creation date
8/2/2019 2:31:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2016 TANK TOP UPGRADE
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bonded Sump Entry Fitting - Termination Style <br /> for Fuel Handling applications <br /> Installation and Application Instructions <br /> 1. Determine entry hole location and cut entry hole in sump <br /> wall using appropriate "C" dimensions in Table 1. <br /> 2. Using 40-60 grit fresh emery cloth or sand paper, sand <br /> the sump wall surfaces,inside and outside,to the outside <br /> diameter of the alignment rings.All glazed surface must <br /> be removed. Once finished sanding, remove all dust <br /> from the sanded area with a clean, dry cloth or brush. , <br /> Do not use compressed air or bare fingers. <br /> 3. Place two alignment rings on sump entry fitting and <br /> insert through sump wall from outside the sump. Locate �. <br /> the 1/4 inch threaded outlet to the desired angular ,, <br /> location. <br /> If this fitting is used in an Open (Drainage) System, <br /> locate the 1/4 inch threaded outlet in the 6 o'clock <br /> position. System 3x2 Part No. 4x3 Part No. <br /> Leave 1/4 inch plastic threaded outlet protector in place <br /> until 1/4 inch fitting installation. Red Thread IIA or 012030-626-0 012040-626-0 <br /> Dualoy 3000/1- <br /> 4. <br /> 000/L4. Dry fit primary pipe and rotate the two rings until the <br /> desired angle is reached. Maximum allowable offset is Dualoy 3000/LCX* 22856830 33856830 <br /> 50. *Includes Closure Nipple <br /> Make alignment marks on the rings, the sump entry <br /> fitting, and the sump wall. Be sure to mark the rings so <br /> they can be placed in the same location and sequence <br /> during bonding. <br /> SUMP WALL <br /> OUTSIDE <br /> Dimensions SUMP <br /> TABLE 1 -Fitting <br /> Size A B C INSIDE <br /> Inch Inch Inch Inch SUMP A <br /> 3 x 2 6.88 4.00 4.00 B <br /> 4 x 3 6.88 4.00 5.00 <br /> NOTE:These fittings can only be bonded to flat walled, _ _ <br /> fiberglass sumps.DO NOT install on thermoplastic or C -T <br /> round sumps. <br /> HOLE <br /> DIA <br /> NT ENTRY TERMINATION <br /> RETAINING ALIGNME <br /> FITTING BODY <br /> RING RINGS <br /> 0` Fiber Glass Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.