My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2017 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 11:51:06 AM
Creation date
8/5/2019 9:15:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S ■ N.J O ■ Q■,I N Environmental Health Department <br /> COUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> 7-ELEVEN INC#19976 1399 N MAIN ST, MANTECA September 17, 2018 <br /> UST System Observations <br /> 319 CCR 2635(b) No spill bucket,failed to contain five gallons,or failed to provide a means to keep it empty D V D R D COS <br /> 320 CCR 2635(b)(2) Overfill prevention system not present or failed to meet overfill requirements ❑V ❑R D COS <br /> 321 CCR 2635(b)(2) Overfill prevention was overridden D V D R ❑COS <br /> 322 HSC 25281.6(a) Unburied below grade emergency generator system failed to meet exemption status ❑V ❑R D COS <br /> 323 HSC 25283.5(a) Unburied below grade UST system failed to meet exemption status D V D R D COS <br /> 324 CCR 2717.1(g) Tampered with red tag D V D R D COS <br /> 325 CCR 2717.1(f) Deposited petroleum into a red tagged UST D V D R D COS <br /> 326 HSC 25299(a)(9) Tampered with or disabled leak detection devices or alarms D V D R D COS <br /> 327 CCR 2631.1 UST system not compatible with the substance stored D V D R ❑COS <br /> 328 HSC 25298 Failed to comply with temporary closure requirements D V D R D COS <br /> 329 HSC 25298 Failed to comply with all permanent closure requirements ❑V ❑R ❑COS <br /> 330 CCR 2636(f)(6) Failure to meet all requirements in lieu of a line leak detector for emergency generator tank system D V D R D COS <br /> 331 CCR 2630(d) Secondarily contained piping not maintained to allow liquid to drain into sump D V D R D COS <br /> 332 CCR 2631(b),2631(d) Primary and/or secondary containment not constructed in accordance with the established standards D V D R D COS <br /> Single-Walled Non-Pressurized Piping <br /> 401 CCR 2636(a)(3) Suction piping not properly sloped or incorrectly located check valve ❑V ❑R ❑COS <br /> 402 CCR 2643(d) Daily monitoring of suction pipe(pre-Jan 1984)not performed ❑V ❑R ❑COS <br /> 403 CCR 2643(d) Triennial 0.1 gph line test for conventional suction piping not performed(pre-January 1984) ❑V D R ❑COS <br /> 404 CCR 2643(e) Biennial 0.1 gph test for gravity piping not performed(pre-January 1984) D V ❑R ❑COS <br /> Other Violations <br /> 2010 See below Unlisted General violation 11V R =COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS ll,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 121 CCR 2712(f Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 9/19/17 and an inspection report was issued identifying information to be submitted <br /> to bring this site into compliance. This information was required to be submitted by 10/19/17. This information was <br /> not received within 30 days resulting in a non-compliant status for this facility. An operator that receives an <br /> inspection report shall have 30 days to submit a written response that includes a statement documenting corrective <br /> actions taken or proposing corrective actions which will be taken. Ensure that a written response documenting <br /> corrective actions taken or proposed is submitted within 30 days of receiving an inspection report. <br /> This is a Class II violation. <br /> FA0000916 PR0231435 SCO01 09/17/2018 <br /> EHD 23-01 Rev.10/31/2017 Page 3 of 4 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.