Laserfiche WebLink
CALIFORNIA LABORATORY SERVICES <br /> 12/27/11 1340 <br /> Page 6 of 6 <br /> I{leinfelder(Stockton) Project: CNP <br /> 2001 Arch-Airport Road,suite 100 Project Number: 101486 CLS Work Order H:CUL0868 <br /> Stockton CA,95206 Project Manager. Ioseph D.Zilles COC#:21292 <br /> Notes and Definitions <br /> QM-7 The spike recovery was outside acceptance limits for the MS and/or MSD. The batch was accepted based on acceptable <br /> LCS/LCSD recovery. <br /> HT-F This is a field test method and it is performed in the lab outside holding time <br /> DET Analyte DETECTED <br /> NO Analyte NOT DETECTED at or above the reporting limit <br /> NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br />