My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
SITE INFORMATION AND CORRESPONDENCE CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 1:25:48 PM
Creation date
8/5/2019 10:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
811
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2003-0141 - 18- <br /> CALIFORNIA <br /> 1g- <br /> CALIFORNIA NATURAL PRODUCTS <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> 9. The Discharger shall report promptly to the Regional Board any material change or proposed <br /> change in the character, location, or volume of the discharge. <br /> 10. In the event of any change in control or ownership of land or waste discharge facilities presently <br /> owned or controlled by the Discharger, then the Discharger shall notify the succeeding owner or <br /> operator of the existence of this Order by letter, a copy of which shall be forwarded to this <br /> office. <br /> 11. The Discharger shall comply with all conditions of this Order, including timely submittal of <br /> technical and monitoring reports as directed by the Executive Officer. Violations may result in <br /> enforcement action, including Regional Board or court orders requiring corrective action or <br /> imposing civil monetary liability, or in revision or rescission of this Order. <br /> 12. A copy of this Order shall be kept at the discharge facility for reference by operating personnel. <br /> Key operating personnel shall be familiar with its contents. <br /> 13. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher BOD <br /> loadings than that specified in Effluent Limitation No. C.2 will not cause or contribute to cause <br /> waste constituents to leach into and degrade underlying groundwater, or cause any other <br /> violation of the terms and conditions of this Order,then this Order may be reopened for <br /> consideration of revision of BOD loading limits. The demonstration shall include the submittal <br /> of a technical report that describes, at a minimum, the results of a field demonstration project <br /> conducted over the course of at least two years on similar soil types as those in the land <br /> application areas and using similar food processing wastewater as that described in the Findings. <br /> Any proposed field demonstration project will be regulated under the terms and conditions of <br /> separate waste discharge requirements. As such, at least 120 days prior to conducting the field <br /> demonstration project, the Discharger(and/or other reasonable party) must submit a complete <br /> Report of Waste Discharge for the proposed field demonstration project. <br /> 14. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher <br /> nitrogen loadings than that specified in Effluent Limitation No. C.1 will not cause or contribute <br /> to cause waste constituents to leach into and degrade underlying groundwater, or cause any <br /> other violation of the terms and conditions of this Order, then this Order may be reopened for <br /> consideration of revision of nitrogen loading limits. The demonstration shall include the <br /> submittal of a technical report that describes, at a minimum, the results of a field demonstration <br /> project conducted over the course of at least two years on similar soil types as those in the land <br /> application areas and using similar food processing wastewater as that described in the Findings. <br /> Any proposed field demonstration project will be regulated under the terms and conditions of <br /> separate waste discharge requirements. As such, at least 120 days prior to conducting the field <br /> demonstration project, the Discharger(and/or other reasonable party) must submit a complete <br /> Report of Waste Discharge for the proposed field demonstration project. <br /> 15. The Regional Board will review this Order periodically and may revise requirements when <br /> necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.