My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
SITE INFORMATION AND CORRESPONDENCE CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 1:25:48 PM
Creation date
8/5/2019 10:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
811
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Installation Workplan - 2 - <br /> Monitoring <br /> 2 - <br /> Monitoring Well Installation Report <br /> E. Surveying Details: discuss how each well will be surveyed to a common reference point horizontal <br /> and vertical survey data is required. <br /> F. Soil Sampling(if applicable): <br /> Cuttings disposal method <br /> Analyses to be run and methods <br /> Sample collection and preservation method <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> G. Well Sampling: <br /> Minimum time after development before sampling(48 hours) <br /> Well purging method and amount of purge water <br /> Sample collection and preservation method <br /> Table describing sample volumes, sample containers,preservation agents, and hold times <br /> QA/QC procedures <br /> H. Water Level Measurement: <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.1 foot. Method and time of water <br /> level measurement shall be specified. <br /> I. Proposed time schedule for work. <br /> Monitoring Well Installation Report of Results <br /> A. Well Construction: <br /> Number and depth of wells drilled <br /> Date(s) wells drilled <br /> Description of drilling and construction <br /> Approximate locations relative to facility site(s) <br /> A well construction diagram for each well must be included in the report, and should contain <br /> the following details: <br /> Total depth drilled <br /> Depth of open hole(same as total depth drilled if no caving occurs) <br /> Footage of hole collapsed <br /> Length of slotted casing installed <br /> Depth of bottom of casing <br /> Depth to top of sand pack <br /> Thickness of sand pack <br /> Depth to top of bentonite seal <br /> Thickness of bentonite seal <br /> Thickness of concrete grout <br />
The URL can be used to link to this page
Your browser does not support the video tag.