Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2002-0071 - 18- <br /> CALIFORNIA NATURAL PRODUCTS <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> waste constituents to leach into and degrade underlying groundwater, or cause any other <br /> violation of the terms and conditions of this Order, then this Order may be reopened for <br /> consideration of revision of BOD loading limits. The demonstration shall include the submittal <br /> of a technical report that describes, at a minimum, the results of a field demonstration project <br /> conducted over the course of at least two years on similar soil types as those in the land <br /> application areas and using similar food processing wastewater as that described in the Findings. <br /> Any proposed field demonstration project will be regulated under the terms and conditions of <br /> separate waste discharge requirements. As such, at least 120 days prior to conducting the field <br /> demonstration project,the Discharger(and/or other reasonable party) must submit a complete <br /> Report of Waste Discharge for the proposed field demonstration project. <br /> 14. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher <br /> nitrogen loadings than that specified in Effluent Limitation No. C.1 will not cause or contribute <br /> to cause waste constituents to leach into and degrade underlying groundwater, or cause any <br /> other violation of the terms and conditions of this Order, then this Order may be reopened for <br /> consideration of revision of nitrogen loading limits. The demonstration shall include the <br /> submittal of a technical report that describes, at a minimum, the results of a field demonstration <br /> project conducted over the course of at least two years on similar soil types as those in the land <br /> application areas and using similar food processing wastewater as that described in the Findings. <br /> Any proposed field demonstration project will be regulated under the terms and conditions of <br /> separate waste discharge requirements. As such, at least 120 days prior to conducting the field <br /> demonstration project, the Discharger(and/or other reasonable party)must submit a complete <br /> Report of Waste Discharge for the proposed field demonstration project. <br /> 15. The Regional Board will review this Order periodically and may revise requirements when <br /> necessary. <br /> I, GARY M. CARLTON, Executive Officer, do hereby certify the foregoing is a full,true, and correct <br /> copy of an Order adopted by the California Regional Water Quality Control Board, Central Valley <br /> Region, on 26 April 2002. <br /> 14� :9 f <br /> Y . CARLTON, Executive Officer <br /> TRO: 4/26/02 <br /> cwy ma...w,w..ioan.rtaw..wow.., <br />