Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. -5- <br /> CALIFORNIA NATURAL PRODUCTS <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> LAND APPLICATION SYSTEM <br /> 26. Wastewater is currently discharged to two land application sites, a 9.2 acre landscaped area and a <br /> 17.6 acre land application area as shown on Attachment B;which is attached hereto and made part <br /> of the Order by reference. The wastewater application areas are termed "landscaped"if they are <br /> planted with perennial grass or other decorative plant and"land application area"if they are <br /> cropped with other plants such as wheat,barley, oats, rye, corn, alfalfa, etc. <br /> 27. In order to reduce the potential for generation of objectionable odors and to land apply the <br /> wastewater in a manner that is more protective of groundwater quality,the Discharger has proposed <br /> to increase the total land available for application from a total of 26.8 acres to 46.3 acres. The <br /> Discharger is proposing development of an additional 3.5 acre landscaped area and a 16.0 acre <br /> land application area. <br /> 28. Wastewater will be delivered to the 16.0 acre land application area via an underground pipeline <br /> within the County right-of-way. <br /> 29. The 9.2 acre landscaped area is bermed around most of the area; areas that are not bermed will be <br /> closely monitored to prevent the generation of runoff. The 3.5 acre landscaped area will not be <br /> bermed but will be posted and closely monitored to prevent runoff. <br /> 30. To control tailwater, the 17.6 acre and 16.0 acre land application areas will be bermed. <br /> Wastewater application will be by flood irrigation. Sprinkler application of wastewater in the land <br /> application areas is acceptable if the application is in compliance with Section D, "Land <br /> Application Area Specifications" and if the land application area has been adequately prepared to <br /> receive sprinkler applied wastewater. The Discharger will grow sudan grass in the summer and a <br /> choice of barley, oats, or wheat in the winter. Other crops may be acceptable as long as the <br /> discharge complies with the Effluent Limitations. <br /> 31. Wastewater will be sprinkler or drip applied to the 3.5 acre and 9.2 acre landscaped areas. Flood <br /> irrigation of wastewater in the landscaped areas is not an acceptable application technique. A full- <br /> time groundskeeper will be responsible for making wastewater applications and ensuring that no <br /> runoff occurs. <br /> 32. The November 2001 RWD addendum presented a water balance which showed adequate land <br /> areas with capacity to accept 290,000 gpd of wastewater and rainfall(using the 100-year return <br /> annual precipitation total). Because adequate land application areas are available, a wastewater <br /> storage pond is not required. The Discharger is allowed to discharge wastewater to the land <br /> application areas (not the landscaped areas) during rain events provided all requirements of the <br /> WDRs are complied with. <br /> 33. The Board received odor complaints in October 1987, July 1997, July 1998, March 2000, and July <br /> 2000. The odor complaints concerned the Discharger's 17.6 acre land application area. <br /> 34. Based on the anticipated wastewater quality and volume discharged from the treatment facility when <br /> operated properly, discharge of the wastewater should comply with the BOD effluent limitations <br /> c.wAi..rws _ vaawwoaoiarcwa..wowca: <br />