Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. 18- <br /> CALIFORNIA NATURAL PRODUCTS <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> project, the Discharger(and/or other reasonable party)must submit a complete Report of Waste <br /> Discharge for the proposed field demonstration project. <br /> 14. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher nitrogen <br /> loadings than that specified in Effluent Limitation No. C.1 will not cause or contribute to cause <br /> waste constituents to leach into and degrade underlying groundwater, or cause any other violation <br /> of the terms and conditions of this Order, then this Order may be reopened for consideration of <br /> revision of nitrogen loading limits. The demonstration shall include the submittal of a technical <br /> report that describes, at a mlmmum, the results of a field demonstration project conducted over <br /> the course of at least two years on similar soil types as those in the land application areas and <br /> using similar food processing wastewater as that described in the Findings. Any proposed field <br /> demonstration project will be regulated under the terms and conditions of separate waste <br /> discharge requirements. As such, at least 120 days prior to conducting the field demonstration <br /> project, the Discharger(and/or other reasonable party)must submit a complete Report of Waste <br /> Discharge for the proposed field demonstration project. <br /> 15. The Board will review this Order periodically and may revise requirements when necessary. <br /> I, GARY M. CARLTON, Executive Officer, do hereby certify the foregoing is a full,true, and correct <br /> copy of an Order adopted by the California Regional Water Quality Control Board, Central Valley <br /> Region, on_ <br /> GARY M. CARLTON,Executive Officer <br /> (date) <br /> TRO: 2/13/2002 <br /> CV1eW Ple�9uN'L MLL hdWWpW 01031TmYn WOW.b <br />