Laserfiche WebLink
MONITORING AND REPORTING PROGRAM -5- <br /> CALIFORNIA NATURAL PRODUCTS <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> C. Annual Report <br /> The Annual Report will include all monitoring data required in the monthly schedule. The Annual Report <br /> shall be submitted to the Regional Board by 1 February each year. In addition to the data normally <br /> presented, the Annual Report shall include the following: <br /> 1. Tabular summaries of all data collected during the year. <br /> 2. The results of land application soils monitoring, including a map depicting sample locations. <br /> 3. An evaluation of the groundwater quality at the wastewater treatment facility. <br /> 4. A discussion of compliance and the corrective action taken, as well as any planned or proposed <br /> actions needed to bring the discharge into full compliance with the waste discharge requirements. <br /> 5. A discussion of any data gaps and potential deficiencies/redundancies in the monitoring system or <br /> reporting program. <br /> 6. A summary of the amount of solids generated and disposed. Identify the name of the solids hauler <br /> and the disposal facility. <br /> 7. An evaluation of future wastewater flow rates. If within the next two years, the flow rate is <br /> projected to increase above the permitted flow rate contained within this Order, then the <br /> Discharger shall also submit a plan and timeline describing how and when it will obtain additional <br /> disposal land or secure additional disposal capacity within an existing municipal wastewater <br /> treatment plant. <br /> The Discharger shall implement the above monitoring program as of the date of this Order. <br /> GARY M. CARLTON, Executive Officer <br /> date <br /> TRO: 2/13/2002 <br />