Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. - 14- <br /> PAT MITCHELL AND CALIFORNIA NATURAL PRODUCTS <br /> WASTEWATER TREATMENT AND DISPOSAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> 12. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher nitrogen <br /> loadings than that specified in Discharge Specification No. 2 will not cause or contribute to cause <br /> waste constituents to leach into and degrade underlying groundwater, or cause any other violation <br /> of the terms and conditions of this Order, then this Order may be reopened for consideration of <br /> revision of nitrogen loading limits. The demonstration shall include the submittal of a technical <br /> report that describes, at a minimum, the results of a field demonstration project conducted over <br /> the course of at least two years on similar soil types as those in the Designated Disposal Areas <br /> and using similar food processing wastewater as that described in Finding No. 12. Any proposed <br /> field demonstration project will be regulated under the terms and conditions of separate waste <br /> discharge requirements. As such, at least 120 days prior to conducting the field demonstration <br /> project, the Discharger(and/or other reasonable party)must submit a complete Report of Waste <br /> Discharge for the proposed field demonstration project. <br /> 13. The Board will review this Order periodically and may revise requirements when necessary. <br /> I, GARY M. CARLTON, Executive Officer, do hereby certify the foregoing is a full, true, and correct <br /> copy of an Order adopted by the California Regional Water Quality Control Board, Central Valley <br /> Region, on_ <br /> GARY M. CARLTON, Executive Officer <br /> TRO: 2/21/2001 <br /> CVYgrn llMn4tifJ.\n Ao1�M.RxDR Rlilul.tr <br />