My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
SITE INFORMATION AND CORRESPONDENCE CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 1:25:48 PM
Creation date
8/5/2019 10:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
811
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California R g oval Water Quality Coontrol Board <br /> Central Valley Region <br /> Robert Schneider,Chair (a <br /> Alan C.Lloyd Ph.D. Arnold Schwarzenegger <br /> Agency Secretary Sacramento Main Office Governor <br /> Internet Address: http://www.swrcb.c&gov/—mgcb5 <br /> 11020 Sun Center Drive,4200,Rancho Cordova,CA 956706114 <br /> Phone(916)464.3291•FAX(916)464-4780 <br /> 22 April 2005 OR 4, 6 7005 <br /> ENPERMIT/SERVIEESENT I h <br /> Cary Keaten Glenn Gebhardt <br /> City of Lathrop Califia LLC <br /> 16775 Howland Road 73 W. Stewart Road <br /> Lathrop, CA 95330 Lathrop, CA 95330 <br /> CONDITIONAL APPROVAL OF GROUNDWATER MONITORING WORKPLAN, CITY OF <br /> LATHROP,MBR WASTEWATER FACILITY,LATHROP, SAN JOA QUIN CO UNTY <br /> I have reviewed the 18 April 2005,Revised Monitoring Well Installation Workplan and Groundwater <br /> Sampling and Analysis Plan, prepared by Hydrofocus. The workplan was prepared in response to Waste <br /> Discharge Requirements (VDRs) Order No. R5-2005-0045, Provision G.l.c. Staff has the following <br /> comments on the workplan: <br /> 1. Please provide a more thorough description of the monitoring wells located on River Islands. <br /> According to the Workplan, of 22 wells only MW-1 through MW-12, MW-18, and MW-20 <br /> have been located and are accessible. All wells that are no longer needed or suitable for <br /> monitoring purposes must be located and properly destroyed. If the wells were surveyed, <br /> locating the wells should be relatively simple. <br /> 2. Please provide a complete inventory of all monitoring wells drilled at River Islands, Mossdale <br /> Village, Reiter Area, and the MBR facility. Do not include wells drilled for the Crossroads <br /> wastewater treatment system. The inventory shall list the wells, who drilled the wells, when <br /> they were drilled, the new name for the wells, and the disposition of the wells. Include <br /> proposed wells on the inventory. <br /> 3. Table 3 and Figures 6a, 6b, 6c, and 6d present the proposed monitoring wells, their purpose, <br /> and the locations of the wells. Review of the figures indicates a number of the wells intended <br /> to serve as background monitoring wells are located at the upgradient side of the land <br /> application areas. Specifically, staff are concerned about the location of the following: <br /> a. In Phase I land application areas,the following wells appear to not be placed in an <br /> optimum location: MWM-24, MWM-18,MWM-3, MBRMW-1, and MBRMW-2. <br /> b. In Phase II land application areas,the following wells appear to not be placed in an <br /> optimum location: MVR-34, MWR-30, MWR-28, and MWR-27. <br /> 4. Section C states that four-inch diameter wells will be placed in six or eight-inch diameter <br /> borings. Installation of four-inch diameter well casing requires a minimum 10-inch diameter <br /> hollow stem auger in order to allow adequate sand pack to be installed. <br /> 5. Section C describes the well construction and a well construction detail is included on <br /> Figure 7. When field conditions allow,please maximize the length of the annular seals <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.