My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
SITE INFORMATION AND CORRESPONDENCE CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 1:25:48 PM
Creation date
8/5/2019 10:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
811
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r •• <br /> Attachment A - 3 - 12 January 2005 <br /> Monitoring Well Requirements <br /> Topographic map showing facility location, roads, surface water bodies <br /> Scaled site map showing all previously existing wells,newly installed wells, surface water <br /> bodies, buildings, waste handling facilities,utilities, and other major physical and man-made <br /> features. <br /> B. Drilling Details (in narrative and/or graphic form): <br /> On-site supervision of drilling and well installation activities <br /> Drilling contractor and driller's name <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals and logging methods <br /> Well boring log <br /> - Well boring number and date drilled <br /> - Borehole diameter and total depth <br /> - Total depth of open hole (same as total depth drilled if no caving or back-grouting <br /> occurs) <br /> - Depth to first encountered groundwater and stabilized groundwater depth <br /> - Detailed description of soils encountered, using the Unified Soil Classification System <br /> C. Well Construction Details (in narrative and/or graphic form): <br /> Well construction diagram, including: <br /> - Monitoring well number and date constructed <br /> - Casing and screen material, diameter, and centralizer spacing (if needed) <br /> - Length of well casing, and length and position of perforated interval <br /> - Thickness,position and composition of surface seal, sanitary seal, and sand pack <br /> - Type of well caps (bottom cap either screw on or secured with stainless steel screws) <br /> E. Well Development: <br /> Date(s) and method of development <br /> How well development completion was determined <br /> Volume of water purged from well and method of development water disposal <br /> Field notes from well development should be included in report <br /> F. Well Survey (survey the top rim of the well casing with the cap removed): <br /> Identify the coordinate system and datum for survey measurements <br /> Describe the measuring points (i.e. ground surface,top of casing, etc.) <br /> Present the well survey report data in a table <br /> Include the Registered Engineer or Licensed Surveyor's report and field notes in appendix <br /> Sacramento Non15 Unit:updated 3 March 2004 <br /> W:ISu fienMwJoMain\CWWIPrtEu[ MChA 12Ln K. <br />
The URL can be used to link to this page
Your browser does not support the video tag.