Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 1 of 1 <br />Test Method Developed By: W Piping Manufacturer r Industry Standard r Professional Engineer <br />r Other (Specify) <br />Test Method Used By: P Pressure r vacuum F Hydrostatic <br />r Other (Spec) <br />Test Equipment Used: au$e Equipment Resolution: 0 loss <br />(Tank 4 - rul) <br />STP Containment I to 1/2, <br />3/4 <br />("Tank 5 - pul) <br />STP Containment I to 1/2, <br />3/4 <br />Piping Material: <br />dw flex <br />dw flex <br />Piping Manufacturer: <br />unknown <br />unknown <br />Piping Diameter: <br />2 in. <br />2 in. <br />n. <br />in. <br />Length of Piping Run: <br />75 ft. <br />50 ft. <br />Product Stored: <br />RUL <br />PUL <br />Method and location of <br />piping -run isolation: <br />sump <br />sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />min <br />min <br />Test Start Time: <br />12:14:00 <br />12:15:00 <br />Initial Reading (RO: <br />5.00000 PSI <br />5.00000 PSI <br />Test End Time: <br />13:14:00 <br />13:15:00 <br />Final Reading (RF): <br />5.00000 PSI <br />5.00000 PSI <br />Test Duration: <br />1 hr <br />1 hr <br />Change in Reading (RF-Ri): <br />0.00000 PSI <br />0.00000 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />+/-0.00000 <br />+/-0.00000 <br />+/- <br />+/- <br />Test Result: <br />Pass <br />Pass <br />Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />