Laserfiche WebLink
RECEIVED <br /> SWRCB.January 2002 NOV 2 4 2014e 1 of 1 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes F i71tiq ITL HEq H <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested 1— T <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: r Pressure r vacuum PF' Hydrostatic <br /> r Other(Specify): <br /> Test Equipment Used: LAKE TEST Equipment Resolution:0.0625 in. <br /> Spill Box#'Tank T5 Spill Box#Tank T4 Spill Box#Tank T5 Spill Box#Tank T4 <br /> PUL-Fill I -Direct- RUL-Fill I -Direct- PUL-Fill 1 -Direct- RUL-Fill I-Direct- <br /> Grade level in Grade level in Grade level in Grade level in <br /> containment sump containment sump containment sump containment sump <br /> Bucket Diameter: 14.00 14.00 14.00 14.00 <br /> Bucket Depth: 12.00 12.50 12.00 12.50 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 09:20:00 09:20:00 12:16:00 11:52:00 <br /> Initial Reading(Rt): 11.75 in. 12.25 in. 11.75 in. 12.25 in. <br /> Test End Time: 09:40:00 09:50:00 13:16:00 12:52:00 <br /> Final Reading(RF): 10.00 in. 10.00 in. 11.75 in. 12.25 in. <br /> Test Duration: 20 min 30 min 1 hr 1 hr <br /> (RF-Rt): -1.75 in. -2.25 in. 0.00 in. 0.00 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-0.00 +/-0.00 <br /> Test Result: Fail Fail Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> sup failed drain was cleaned and sup passed.reg failed fill cap was replaced and it passed. <br /> WO:2319460 <br />