Laserfiche WebLink
RECEIVED <br />swRCB, January 2002 OCT 2 5 2013 Page 1 or 1 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes r 1=NV1BQNMENTAL <br />Spill/Overfill Containment Boxes are Present, but were Not Tested r HEALTH DEPA� ssTMI Eid <br />Test Method Developed By: P/7 Spill Bucket Manufacturer F. Industry Standard F. Professional Engineer <br />F Other (Specify): <br />'fest Method Used By: 7Pressure F vacuum W Hydrostatic <br />r7 Other (Specify): <br />Test Equipment Used: Equipment Resolution: <br />Spill Box # Tank "1'4 <br />RUL - Fill 1 - Direct - <br />Grade level in <br />containment sump <br />Spill Box # Tank T5 <br />PUL - FilI 1 -Direct - <br />Grade level in <br />containment sump <br />Spill Bos # <br />Spill Bos # <br />Bucket Diameter: <br />14.00 <br />14.00 <br />Bucket Depth: <br />13.00 <br />13.00 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />2 min <br />2 min <br />min <br />min <br />Test Start Time: <br />12:00:00 <br />12:00:00 <br />Initial Reading (RI): <br />12.25 in. <br />12.25 in. <br />Test End Time: <br />01:00:00 <br />01:00:00 <br />Final Reading (RF): <br />12.25 in. <br />12.25 in. <br />Test Duration: <br />1 hr <br />1 hr <br />Change in Reading (RF -Rt): <br />0.00 in. <br />0.00 in. <br />Pass/Fail Threshold or Criteria: <br />+/-0.00 <br />+/-0.00 <br />+/- <br />+/- <br />Test Result: <br />Pass <br />Pass <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />WO: 2313418 <br />