Laserfiche WebLink
SWRCB, January 2002 V <br />Page 2 <br />9. LL/OVERFILL CONTAINMENT bJXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: ❑ Spill Bucket Manufacturer <br />❑ Other (Spec) <br />Industry Standard Professional Engineer <br />Test Method Used: ❑ Pressure <br />❑ Other (Specify) <br />Vacuum Hydrostatic <br />Test Equipment Used: <br />Bucket Diameter: <br />Spill Box # 91 1 Spill Box # <br />14 <br />Equipment Resolution: <br />Spill Box # Spill Box # <br />Bucket Depth: <br />12 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />1 MIN <br />Test Start Time: <br />1615 <br />Initial Reading (RI ): <br />10 1/2 <br />Test End Time: <br />1715 <br />Final Reading (RF ): <br />10 1/2 <br />Test Duration: <br />1 HR <br />Change in Reading (R F - 1� ) <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />Test Result: <br />El Pass 1:1 Fail <br />D Pass 1:1 Fail <br />E]Pass D Fail <br />Pass El Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />