My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2005 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 3:13:32 AM
Creation date
8/6/2019 2:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2009
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: ' ' . V <br />of'festing/Servicing: <br />'F. In -Tank Gauging / SIR Equipment: <br />Check this box if tank gauging is used only for inventory control. <br />C3Check this box if no tank gau17 <br />ging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipmell.Ws used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes ❑ No* For equipment start-up or annual equipment.5peffication, was a leak simulated to verify LLD performance? <br />❑ N/A (Check all that apply) Simulated leak rate:,U3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />s ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />es ❑ No* Was the testing apparatus properly calibrated? <br />Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />I Yes ❑ * For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />--------------------- <br />' N/A . <br />I Yes ❑ iyo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A or disconnected? <br />Yes ❑ * For electronic LLDs, does Ilse turbine automatically shut off if any portion of the monitoring system <br />JX N/A malfunctions or fails a test? <br />Yes _❑ * For electronic LLDs, have all accessible wiring connections been visually inspected? <br />1a N/A <br />Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />n the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.