Laserfiche WebLink
Site Address: ' ' . V <br />of'festing/Servicing: <br />'F. In -Tank Gauging / SIR Equipment: <br />Check this box if tank gauging is used only for inventory control. <br />C3Check this box if no tank gau17 <br />ging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipmell.Ws used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes ❑ No* For equipment start-up or annual equipment.5peffication, was a leak simulated to verify LLD performance? <br />❑ N/A (Check all that apply) Simulated leak rate:,U3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />s ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />es ❑ No* Was the testing apparatus properly calibrated? <br />Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />I Yes ❑ * For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />--------------------- <br />' N/A . <br />I Yes ❑ iyo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A or disconnected? <br />Yes ❑ * For electronic LLDs, does Ilse turbine automatically shut off if any portion of the monitoring system <br />JX N/A malfunctions or fails a test? <br />Yes _❑ * For electronic LLDs, have all accessible wiring connections been visually inspected? <br />1a N/A <br />Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />n the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Comments: <br />