Laserfiche WebLink
SAN JOAQUIN COUNTY <br />VIRONMENTAL HEALTH DEPARTMENT <br />304 East Weber Avenue, 3`d Floor, Stockton, CA 95202-2708 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />-1 - <br />Z/o7 <br />Facility Address: <br />Service Request #: <br />3 cl N A1N M r <br />sw#ooggz60 <br />Onsite Service Technician's Name: <br />ICC Service Technician/Installer Certification #: <br />Manufacturer Training: <br />,31M NuTOWS <br />S-z.Wia4--" r <br />P 30G- - <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ electronic Serial #: <br />Rece d $ y: <br />VM <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line testprogramineAd <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />°I Spill bucket ❑ minimum 5 gallon <br />GYl hour hydrostatic ❑ Incon TS -STS <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ Caldwell System ❑ Other <br />Rece d $ y: <br />VM <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment repairs for: <br />❑ <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />pcaid <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: to V <br />Rece d $ y: <br />VM <br />Title: <br />e <br />j <br />U <br />EHD 23-04 <br />1/3/07 <br />