Laserfiche WebLink
SWRCB;January 2002 Page 2. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard a Professional Engineer <br /> El Other (Spec) <br /> Test Method Used: F] Pressure Vacuum Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used: vp 1 t Equipment Resolution: +-.00211 <br /> Sump# 4 REG Sump# 5 PRE Sump# Sump# <br /> Sump Diameter: 48" 48" <br /> Sump Depth: 6111 51'r <br /> Sump Material: fiberglass fiberglass <br /> Height from Tank Top to Top of 15y' 1911 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 4" 411 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 1711 2111 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both EYesalloaN aYesalloaN ayes allo❑N ayes alloaN <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c 2-5 s e c <br /> Is system programmed for fail-safe ❑ � ❑ � ❑ ❑ ❑ ❑ <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No <br /> Was fail-safe verified to be ayes alloaN ayes alloaN ayes alloa <br /> operational? N E Yes alloaN <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 8:12 8:00 <br /> Initial Reading(R1): 0 0 <br /> Test End Time: 8:4 2 8:30 <br /> Final Reading(RF): -.0003" +.0006" <br /> Test Duration: 30min 30min <br /> Change in Reading(R F-R1 ): -.0003" +.0006" <br /> Pass/Fail Threshold or Criteria: +-.00211 —. 00211 <br /> Test Result: � Pass Fail `LJ PassEl Fail 0 Pass D Fail D Pass D Fail <br /> Was sensor removed for testing? aYesalloaNA aYesalloaNA aYesaN(CN ❑Yes alloaNA <br /> Was sensor properly replaced and fl � C X❑ � ❑ � ` J ❑ a <br /> verified functional after testing? Ye N NA Ye N NA Ye NLNA Yes N A <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO" or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />