Laserfiche WebLink
Hydro-testing Stored energy/High Check that all connections are <br /> pressure/Equipment failure properly fastened and tight <br /> Ensure there are whip checks at all <br /> connections and safety pins where <br /> applicable <br /> When coming off spike,make sure <br /> the hose configuration is set up to <br /> keep employees away from the <br /> nozzle <br /> Ensure that the hose is properly <br /> secured to the barrel at all times <br /> Employee injury/Equipment damage Establish a 50'buffer using red <br /> danger tape and the proper signage <br /> Keep all employees and equipment <br /> out of the area that do not need to <br /> be there <br /> Compose a thorough JHA and <br /> perform a tailboard meeting with <br /> all crew members prior to <br /> beginning the task and as new <br /> individuals show up on site(meet <br /> and greet) <br /> Page <br /> 14 <br />