Laserfiche WebLink
Section III <br /> Scope Of Work <br /> Barnard plans to dig 2 soil boring logs per the PG&E provided KMZ file,these boring logs will be excavated to a depth <br /> of 80'.Our goal is to gather soil boring logs for the creation of soil profiles for future PG&E work.We will set up traffic <br /> control at each location as per the provided traffic control plans. We will conduct GPR at each site prior to any <br /> excavations.Barnard will be utilizing Cascade Drilling to perform the soil boring.Once the logs have been taken, <br /> Kleinfelder will analyze and assemble a report to be submitted to PG&E. <br /> Section V <br /> Job Location, Lodi, CA <br /> Project Overview <br /> X <br /> - <br /> Piin.�r:. -- <br /> Boring B-1 , <br /> (Primary Location) .�. <br /> Temporary Worksoa-, r - <br /> Area 2700 Sq Fi <br /> Geotecn Boring Bonng B-2 Temporary Workspace <br /> Catch Basins 5 Alternative Location) Area 1651 Sq.Ft <br /> 1031011Wastewater Manholes Bgr:ng B-' ■ <br /> ,Alterranve.L.O aticn) <br /> Storm Drain Manholes <br /> Pump Station f _ <br /> Transmission Main I- _ t ✓,;; <br /> Water Mains <br /> Wastewater Mains <br /> Storm Mains <br /> Temporary Workspace Area <br /> ► � �: ` <br /> Parcels t 1• �-�•� <br /> Page 4 <br />