Laserfiche WebLink
PERMIT NO.: 1019-NTK-0429 <br /> PERMITTEE: Pacific Gas&Electric Company <br /> DATE: June 19,2019 <br /> "If feasible, monuments should not be set within the traveled way. All monuments that must be set or <br /> perpetuated in paved surfaces, shall be constructed in accordance with Caltrans Standard Specification <br /> Section 81 'monuments' and Standard Plan A74. Type D, or equal with prior approval of the District <br /> Surveys Engineer.' <br /> "Copies of Corner Records filed or Record of Surveys recorded in compliance with the Business and <br /> Professions Code shall be forwarded to the District Surveys Engineer." <br /> Except when necessary, as determined by the State Representative, no installation, construction <br /> equipment or personal vehicles shall operate or park within the traveled way. <br /> All work shall be conducted in such a manner that the excavation, excavated earth, materials and <br /> equipment will not cause any inconvenience to the highway traffic or to traffic entering the highway from <br /> any public or private approach. <br /> No earth or construction materials are to be dragged or scraped across the highway pavement. No <br /> excavated earth shall be placed or allowed to remain at a location where it can be tracked onto the <br /> highway traveled way or any public or private approach by the Permittee's construction equipment, or by <br /> traffic entering or leaving the highway traveled way. Any excavated earth or mud so tracked onto the <br /> highway pavement or public or private approach shall be immediately removed by the Permittee. <br /> The State of California, Department of Transportation makes no assurance or expressed warranty that <br /> the plans are completed or that the planned construction fits field conditions. Should additional work or <br /> modifications of the work be required in order to meet established Department Standards or in order to <br /> fit field conditions, the work shall be performed by Permittee as directed by the State's Inspector. <br /> Permittee shall fully conform to the requirements of the Caltrans statewide NPDES Storm Water Permit, <br /> Order No. 2012-0011-DWQ, NPDES No. CAS000003, re-issued by the State Water Resources <br /> Control Board on September 19, 2012. The Permittee shall also conform to the requirements of the <br /> General NPDES Permit for construction Activities and any subsequent General Permit in effect at the <br /> time of issuance of this Encroachment Permit. These permits regulate storm water discharges <br /> associated with year-round construction or special event encroachment activities. <br /> For all projects of 1 acre or more the Permittee shall develop, implement, and maintain a Storm Water <br /> Pollution Prevention Plan (SWPPP) and for projects less than 1 acre a Water Pollution Control <br /> Program (WPCP). Either the Plan or Program shall also conform to the requirements of the Caltrans <br /> Storm Water Quality Handbook, Construction Contractor's Guide and Specifications and Caltrans <br /> Specification Section 7-1-.01G and subsequent revisions. <br /> 3 of 3 <br />