Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> .cl�ip T1mkrK logy <br /> TEST DATE:10/24/01 8900 SHOAL CREEK, BUILDING 200 WORK ORDER NUMBER2219064 <br /> CLIENT:7-ELEVEN, INC. AUSTIN,TEXAS 78757(512)451-6334 SITE:7-ELEVEN # 19976 MKT 2237 <br /> TANK INFORMATION <br /> Tank ID: MUL 2 Tank manifolded: No Bottom to top fill in inches: 141.0 <br /> Product: MIDGRADE Vent manifolded: No Bottom to grade in inches: 151.0 <br /> Capacity in gallons: 9,995 Vapor recovery manifolded: YES Fill pipe length in inches: 46.0 <br /> Diameter in inches: 95.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 330 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW STEEL Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS:,'­ Test method: FTA ,- <br /> Start(in) End(in) <br /> Dipped Water Level: New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Product Level: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Probe Water Level: Make: VAPORLESS <br /> Ingress Detected: Water Bubble Ullage Model: LD2000 <br /> Test time: S/N: 57789 <br /> Inclinometer reading: Open time in sec: 5.00 <br /> VacuTect Test Type: NOT Holding psi: 25 <br /> TESTED Resiliency cc: 200 NOT <br /> VacuTect Probe Entry Point: Test leak rate ml/m: 189.0 TESTED <br /> Pressure Set Point: Metering psi: 10 <br /> Tank water level in inches: Calib. leak in gph: 3.00 <br /> Water table depth in inches: Results: PASS <br /> Determined by(method): <br /> Result: <br /> COMMENTS <br /> COMMENTS <br /> UNE TEST RESULTS Test type: Tnn- <br /> `IE, F: B �� C D ;+ � Ma <br /> Material: ENVIROFLEX <br /> Diameter(in): 2.0 <br /> Length (ft): 45.0 <br /> Test psi: so <br /> Bleedback cc: 210 <br /> Test time(min): 60 NOT NOT NOT <br /> Start time: 10-.18 TESTED TESTED TESTED <br /> End time: 11:18 <br /> Final gph: 0.000 <br /> Result: PASS <br /> Pump type: PRESSURE <br /> Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 10/26/2001 18:13 <br />