My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 1998 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 3:46:44 AM
Creation date
8/8/2019 2:04:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2004
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-03-2002 14:27 SOUTHLAND CORP NW DIV. 503 977 7711 P.05i19 <br /> WRIT'ir,N MON1TORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> Th16 monituring urogram must be kept at the UST locallrm ai all tinter.The intormation on this monituriuy,program are <br /> conditions of the operating permit,The pennil holder must notify Environmental Health llcparimen4(209)468-3420 within 30 <br /> days of any changes to the monitoring procedures,unless required to obtain apiunvsl or a permit before making the change. <br /> Required by CCR 2632(cl)and 2641(h). DATE 3/21/2002 <br /> FACILITY NAMF. 7-lrlevcn t/19976 _ <br /> FACILITY ADDRESS 1399 North Main Street,Mutteca,CA <br /> I_Namc(s)and'fitle(s)of the peupie responsible for pertorming the monitoring anrUor maintenance <br /> The store operator is responsible for perrurniiingthe monitoring. <br /> gaLaamento Maintenance and E� orf ms the maintenance on the equi meat <br /> 2.Describc the frequency of perforating The monitoring Ibr: <br /> TANKS Continuous interstitial monitoring PiPiNG Continuous sump monitoritsu <br /> 3.Dc3cribe the Ixation(s)of whr.rc die monitoring will be performed.iv:lurtrlit,rt f.rerrrors <br /> The Interstitial stnsvirs for the tan.10 are Iocalad in the irtici crlTial spaces at the end of each tank The piiritrg <br /> sensors are lusted in rash tank'3 turbine sump. — <br /> 4.DQacr/be the f,lh,wirt>;cquiprnant.tbr each imdergrauntl.tturuge tank. <br /> Name and Model orMonituruL8 P'"'rl YcodorRoot TLS390 _ <br /> Name mud Model of Linc Lealt Deleetori; Vaporlece LD2000 <br /> Name and Mndrl of Annular Sensors YccdorRoot#794390-420 <br /> Name Nod Model of Piping Sensors Vccderlcoot#794380_392 <br /> Name.dttd Model of Di3penser Sensors Vicedorkoot g791380-208 <br /> Type of owrrfill prevention Finao Wheaton 61 S0 <br /> S.Do the Turbine Sensors and Dispenser Pan Sensors strut down the turbine? Yes N No❑ <br /> Does the turbine shut down it a sensor is disconnected? Yes® No❑ <br /> Does the turbine shut down is the monitoring panel loses power? Yes® No O <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> The alarm history will be stored in the VeederRoot Tank Gauge and available via printout. <br /> Maintenance records wt I be recorded on an equipment maintenance lag an stored nt the site. _ <br /> 7.Maintctiance of Ilse inouitoring equipment must be performai at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? Mainlrntutce and repair of the equipment is performed as <br /> needed. Tl it VeedcrRoot Ti,6350 is certified in the mundi of 0.doher. — <br /> Nate;Por non,tnarollattows rhe.uua,ndury eoutainratrnt must be torted 6 months after inerallattnn.All sewndavy tvurabiment systems must ba <br /> tast-dunce every 96 wonths with initial tusung porfLrmed 6ef,ru n�«:�rrth2r3t.znn3, <br /> U.Describe the training necessary For 11,r operation of US 1'system,inaluding piping,Ntid the Inonitoring <br /> equipment. "training is provided for new employees. Training refroubiers m r offered as needed. The operations <br /> suatstsal far the equipment was provided to she store tsperatus when the equipment was installed. _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.