My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 1998 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 3:46:44 AM
Creation date
8/8/2019 2:04:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2004
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-03-2002 14:29 qOUTHLAND CORP NW DIV. 503 9?? ??11 P. 12i19 <br /> Monit,,-Ing System Certification <br /> Site Address: 1399 N. MAIN ST. Date of Testing/Service! 06/11/2002 <br /> NORTH GATE <br /> F. In-Tank Gauging/SIR Equipment ❑ Chock this box if tank gauging is used only for inventory control. <br /> ❑ Chock this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed If In-tank gauging equipment is used to perform leak detection monitoring. <br /> complete the following checklist: <br /> ❑Yee ❑No• Has all Input wiring been inspected for propor entry and termination,including testing for ground faults? <br /> ❑Yes ❑No- Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes []No• Was accuracy of system product level readings tested? <br /> ❑Yea FIN.• Was accuracy of system water level readings tested? <br /> Yee ❑No• Were all probes reinstalled proporly? <br /> ❑res ❑No' Were ail items on the equipment manufacturers'maintenance checklist comploted7 <br /> In the Section H.below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not Installed. <br /> Complete the following checkllat: <br /> For equipment start-up or annual oquipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes ❑No' N/A (Chock all that apply)Simulated leak rate! Q 3 g.p,h❑0.1 g.p.h ❑0.2 g.p.h <br /> X Yes No' were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x Yes ❑No• Was the testing apparatus properly calibrated? <br /> 0 Yea ❑No• ❑NIA For mechanical LLDs,does the LLD restrict product flow If it detects a leak? <br /> ❑Yes ❑No' ❑X NIA For electronic LLDs.does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes []No• Q NIA For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system Is disabled or disconnected? <br /> ❑Yes ❑No0 NIA For olectronlc LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a lest? <br /> ❑Yes []No' ❑x MA For electronic LLDs,have all accessiblo wiring connections been visually inspected? <br /> ❑Yes ❑No• Wore all items on the equipmonl manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when thoso deficiencies were or will be corroctod. <br /> H. Comments: <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.