Laserfiche WebLink
INDIVIDLW TANK INFORMATION AN EST RESULTS <br /> l <br /> &F-P,723nkno%gy <br /> 8900 SHOAL CREEK, BUILDING 200 <br /> TEST DATE: 07/17/03 AUSTIN,TEXAS 78757(512)451-6334 WORK ORDER NUMBER: 2227624 <br /> CLIENT: 7-ELEVEN, INC. SITE: 7-ELEVEN # 19976 MKT <br /> Tank ID: #2 3 Tank manifolded: NO Bottom to top fill in inches: 143.0 <br /> Product: PREMIUM Vent manifolded: NO Bottom to grade in inches: 150.0 <br /> Capacity in gallons: 9,684 Vapor recovery manifolded: yEs Fill pipe length in inches: 53.2 <br /> Diameter in inches: 90.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 356 Overspill protection: yEs Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> TANKT <br /> 5 <br /> £S t1 {? <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: RED JA=T <br /> Fluid volume in gallons: Model: Fx1V <br /> Tank water level in inches: S/N: unreadable <br /> Test time: Open time in sec: 4.00 <br /> Number of thermisters: NOT <br /> TESTED Holding psi: 24 NOT <br /> Specific gravity: Resiliency cc: 140 TESTED <br /> Water table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: 10 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> 171ATE`rTRb`1 . S :IS/# EE1Er2 ` #'fi pk? "� <br /> . .. <br /> LINE A :' <br /> Test time: <br /> Ullage volume: Material: ENVIRON <br /> Ullage pressure: Diameter(in): 1.5 <br /> Results: Length (ft): 40.0 <br /> Test psi: 50 <br /> DATA FOR UTS-4T ONLY: Bleedback cc: 0 <br /> Time of test 1: Test time (min): 60 <br /> Temperature: NOT Start time: 16:34 NOT NOT NOT <br /> Flow rate (cfh): TESTED End time: 17:34 TESTED TESTED TESTED <br /> Time of test 2: Final gph: 0.000 <br /> Temperature: Result: PASS <br /> Flow rate (cfh): Pump type: PRESSURE <br /> Time of test 3: Pump make: FE PETRO <br /> Temperature: <br /> Flow rate (cfh): Impact Valves Operational: yES <br /> COMMENTS COMMENTS <br /> Printed 07/23/2003 12:06 SBOWERS <br />