Laserfiche WebLink
SECO W `ecor nom <br /> INTEf. IONAL 3017�Cil9ore Road,Suite 100 <br /> S E C O R Rancho Cordova, g95670INCORPORATED 976-861-0400 ,L� <br /> 916-861.0430 FAX <br /> January 30, 2003 <br /> Ms. Kasey Foley <br /> County of San Joaquin <br /> Environmental Health Department <br /> 304 East Weber Avenue, 3rd floor <br /> Stockton, CA 95202 <br /> RE: Work Plan For Soil Compliance <br /> 7-Eleven Store No. 14117 7-Eleven Store No. 17334 <br /> 2725 Country Club Boulevard 4501 North Pershing Avenue <br /> Stockton, California Stockton, California <br /> SECOR Project No.: 77EL.14117.00 SECOR Project No.: 77EL.17334.00 <br /> 7-Eleven Store No. 17647 7-Eleven Store No. 19976 <br /> 1048 West Yosemite Avenue 1399 North Main Street <br /> Manteca, California Manteca, California <br /> SECOR Project No.: 77EL.17647.00 SECOR Project No.: 77EL.19976.00 <br /> 7-Eleven Store No. 20632 7-Eleven Store No. 32190 <br /> 4627 Da Vinci Drive 4943 South State Route 99 <br /> Stockton, California Stockton, California <br /> SECOR Project No.: 77EL.20632.00 SECOR Project No.: 77EL.32190.00 <br /> 7-Eleven Store No. 32262 <br /> 2360 West Grantline <br /> Tracy, California <br /> SECOR Project No.: 77EL.32262.00 <br /> Dear Ms. Foley: <br /> On behalf of 7-Eleven Incorporated (7-Eleven), SECOR International Incorporated (SECOR) presents the <br /> following work plan for soil management during removal and replacement of product piping and sump installation <br /> activities at the subject sites listed above. The work plan has been prepared in response to San Joaquin County, <br /> Environmental Health Department (SJCEHD) permit requirements, and has been prepared in accordance with the <br /> San Joaquin permit to perform UST and fuel line upgrades. <br /> SCOPE OF SERVICES <br /> Glacier Environmental Services will be performing fuel line upgrades and possible underground storage tank <br /> sump replacements at the sites mentioned above. During this time, SECOR proposes to collect soil samples and <br /> manage soil was generated during site activities. SECOR's proposed scope of work includes the following: <br /> Health and Safety Plan <br /> SECOR will prepare a site-specific health and safety plan. SECOR personnel and subcontractors on-site will be <br /> required to review the health and safety plan prior to commencement of field activities, and to comply with the <br /> guidelines established in the plan. <br /> Work Plan For Soil Compliance.doc <br />