Laserfiche WebLink
UST SYSTEM DRAWIN INFORMATION <br /> 1. I Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> installed). <br /> 2. / Plans drawn to scale in non-erasable print. <br /> V_3. _ Plot plan to show location of tanks and all associated piping. <br /> 4. <br /> Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. _ Detail of tank,associated piping,excavation and cover. <br /> 7. _Z Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> / Article 3,Section 2631 (b)&2635] <br /> 8. __V__ Verification of product compatibility with the tank(s),piping, monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. Manufacturer's written installation instructions fortank(s), piping, monitoring devices,etc. <br /> 10. At the installation site, prior to installation,a tightness test shall be performed on both primary(1)and secondary <br /> (2)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. _�% Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK# s l a Z u n n <br /> CAPACITY tJ' UC.<D /0 onn <br /> MANUFACTURERXZx�s kEA?X65 <br /> h�jC�l �.9 S f7�X/2 r�35 <br /> monFi <br /> PRODUCT (5A50 <br /> Is we aab1,w <br /> CORROSION WI A /VIA <br /> Y{s [s <br /> COMPATIBILITY <br /> WITH 100% �,e s yCS <br /> 13. TANK(s)TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />