My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 4:39:40 AM
Creation date
8/8/2019 2:05:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. ____ Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. ____ Tank cross-sectional diagram. <br /> 6. Detail of tank,associated piping,excavation and cover. <br /> 7. Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3,Section 2631 (b)&2635] <br /> 8. ____ Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. ____ Manufacturer's written installation instructions fortank(s), piping, monitoring devices,etc. <br /> 10. ____ At the installation site, prior to installation, a tightness test shall be performed on both primary(1)and secondary <br /> (2)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. ____ Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7,Section 25291 (h)] <br /> 12 TANK COMPOSITION <br /> TANK# k ( k k k N <br /> CAPACITY /J Coco /0 onn <br /> MANUFACTURER X61ZX&,5 k4�XE5 <br /> PRODUCT <br /> GH 50 1#we igAZoh-v <br /> CORROSION <br /> COMPATIBILITY <br /> WITH 100, yes yes <br /> 13. TANK(s)TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.